01Dig out to formation
Down to firm ground and carted away. A drive carries a car, so the depth is not the same as a patio.
02Edgings set first
Kerbs, setts or block soldier courses concreted in before the surface goes anywhere. Edges are what hold a driveway together.
03Sub-base compacted in layers
MOT type 1 in passes with a roller or heavy plate, checked for level as it goes up.
04Drainage sorted
Channel drains at thresholds and garage doors, and a permeable build-up or a run-off point where the regulations and the ground need one.
05Binder or laying course
Tarmac binder under resin, or screeded sharp sand under blocks — whichever the surface calls for.
06Surface laid and finished
Resin trowelled out in one continuous pour, or blocks laid, cut in and sand brushed. Then it’s washed off and it’s yours.